NEW

Connection Bridge

The connection bridge allows lifting with the APS80 and APS90 levers in a parallel action, and gives double the lifting power before using two CL10 lifters.

Connection Bridge
Connection Bridge

Tip: Hover/tap feature points to learn more.

Australian Made

Applications

Manholes

Description

The connection bridge allows lifting with the APS80 and APS90 levers in a parallel action, and gives double the lifting power before using two CL10 lifters.

The use of two CL10 cover lifters in parallel is needed when there is minimal magnetic contact on the cover or when it is too heavy.

Used in combination with

  • CL10
  • APS80
  • APS90

Specs

Before

After

Features

Galvanised steel
More details
Galvanised steel

Works with

No items found.

Watch more

View the Connection Bridge in action. Learn how it works, why it was created and see how it's used to solve common issues faced within the industry.

Comparison Calculator

Compare SAM with traditional manhole opening procedures, and see the costs you’ll save.
You can adjust the fields in white.

SAM vs. TRaditional

Hourly Rate (Per Employee)
Employees Required
Set up Time (Min)
Manhole Openings Per Day
Cost per Manhole Opening
$0.00
with SAM
$0.00
with traditional
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Summary

Savings per Manhole
$0
ROI in
0
manhole openings
or
0
days

SAM offers a fast return on investment by offering an efficient turn around time, with only one worker needed. Saving your business money that’s ongoing.

Purchase SAM

Distributors

World Map
No items found.
Become a distributor

Enquire

Thank you! Your enquiry has been received.
Oops! Something went wrong while submitting the form.